Device

Main Structure

to the following information
  • visible spectroscopy
  • Filterscope
  • Ha
  • ECE
  • TV
  • mm-wave interferometer
  • Movable hall probe
  • ECH:84GHz, 500kW, 2s
  • ICRH:30~50MHz, 2 MW, 300s
  • Vacuum Pumping System - VV : 42,400 l/s, Cryostat : 36,900 l/s
  • Helium Distribution System:Supercritical, 4.5K, 600 g/s

Superconducting Tokamak The Superconducting Magnet system consists of 16 TF(Toroidal Field) coils and 14PF(Poloidal Field) coils. Both of the TF and PF coil system use internally cooled superconductors. The TF coil system provides a field of 3.5 T at a plasma center, with a peak flux density at the TF coils of 7.5 T and the stored energy is 470 MJ. Incoloy 908 conduit and Nb3Sn superconducting cable are used for the TF CICC. The nominal current of TF coils is 35.2 kA with all coils in series. The PF coil system provides 17 V-sec and sustains the plasma current of 2 MA for 20 seconds inductively which consists of 8 coils in the CS(Central Solenoide) coil system and 6 outer PF coils. PF 1-5 coils use Nb3Sn CICC in Incoloy 908 conduit and PF 6-7 coils use NbTi CICC in a modified stainless steel 316LN.

Ancillary Systems

to the following information
Ancillary System
  • B2
    • Current Lead System
    • Magnet Power Supply
  • B1
    • Tokamak Monitoring System
    • Quench Detection System
  • 1F
    • Fueling/Glow Discharge
  • 2F
    • He Distibution
    • Cryogenic System
    • Diagnostic DAQ System
    • ICRHSystem
    • Vacuum Pumping System
    • Fueling/Glow Discharge
  • 3F
    • ECH Systenm

Diagnostics

Schematics of the KSTAR device
Diagnostics
  • A
    Basic Diagnostice
    MD Feedthough Inspeciton 2luminator
    Baseline 1
    Edge reflectometer
    Baseline 2,3,4
    Survey IR TV
    CES Background Escaping fast-ion detector
  • B
    Basic Diagnostice
    none
    Baseline 1
    X-Ray Crytal Spec.
    Baseline 2,3,4
    Thomson scattering(beam dump)
  • C
    Basic Diagnostice
    none
    Baseline 1
    Recip.Lanmuir Probe(Movable)
    X-Ray Pinhole Camera
    Baseline 2,3,4
    none
  • D
    Basic Diagnostice
    Visible/H-alpha TV
    Baseline 1
    Soft X-Ray Array
    Bolometer Array
    Baseline 2,3,4
    Survey IR TV
    X-Ray PHA
    Impurity Pellet Injector
  • E
    Basic Diagnostice
    MD Feedthough nspection
    22luminator Survey IR TV
    Baseline 1
    none
    Baseline 2,3,4
    Movable Lanmuir Probe
  • F
    Basic Diagnostice
    none
    Baseline 1
    X-Ray Crystal Spec.
    Baseline 2,3,4
    Soft X-Ray Spec.
    VUV Survey Spec.
  • G
    Basic Diagnostice
    MM-Wave Interferometer
    Baseline 1
    Reflectometer
    Baseline 2,3,4
    MIR/ECEI
  • H
    Basic Diagnostice
    none
    Baseline 1
    none
    Baseline 2,3,4
    Tangential FIR Interferometer(laser input)
  • I
    Basic Diagnostice
    MD Feedthrough
    Visible/H-alpha TV
    Inspection 2luminator/dd>
    Baseline 1
    none
    Baseline 2,3,4
    Survey IR TV MSE
  • J
    Basic Diagnostice
    visible Survey Spec.
    Baseline 1
    H-alpha Monitor
    Baseline 2,3,4
    Visible Brem. Array
    Visible Filterscope
  • K
    Basic Diagnostice
    ECE Hetero. Radiometer
    Baseline 1
    none
    Baseline 2,3,4
    ECE Grating Polycromator
    Diag.Neutral Beam
    LIF(optics)
  • L
    Basic Diagnostice
    none
    Baseline 1
    Bolometer Array
    Baseline 2,3,4
    Thomson Scatt.
    Laser input
    CX-NPA
  • M
    Basic Diagnostice
    MD Feedthrough
    Inspection liiuuminator
    Baseline 1
    none
    Baseline 2,3,4
    CES / MSE/ BES
  • N
    Basic Diagnostice
    none
    Baseline 1
    none
    Baseline 2,3,4
    Thomson Scatt
    Divertor Thomson(optics)
  • O
    Basic Diagnostice
    none
    Baseline 1
    none
    Baseline 2,3,4
    none
  • P
    Basic Diagnostice
    none
    Baseline 1
    none
    Baseline 2,3,4
    none

Heating Devices

to the following information
Heating Devices
  • MBI-2(2017~2020)
  • CNT(under consideration)
  • ECCD(2011~2015)
  • Cryostat pumping duct
  • Helium distribution box
  • LHCD(2011~2016)
  • ICRF
  • Start-up ECH
  • MBI-1(2010~2014)